Akmar Hisham
← All works

Retail property · REIT · Digital Product · Visuals

Spatial Map Design for In-Mall Web App Digital Way Finding

Helping customers navigating to their desired destination.

ClientIOI City MallRoleSenior Executive, Graphic Designer
TimelineJuly 2024
Headline result2.19Minteractions a year across 3 malls (2025)
The wayfinding web app's illustrated floor maps on a tablet, a laptop and a phone, the phone plotting a walking route

Overview

IOI City Mall launched a web-based in-mall digital way finding system, developed by third-party vendor Abuzz Solutions, across selected malls:

The web interface and system infrastructure were handled externally.

I was tasked to design and construct the illustrated floor maps, which serve as the core navigation layer for the entire system.

Everything — tenant search, amenities filtering, routing overlays — would sit on top of these maps.

Accuracy and clarity were critical.

Wayfinding directory kiosk in IOI City Mall next to a digital advertising screen

Problem

The foundation resource provided was a 1-month validity period of leasing plan in PDF format only. However:

1. Leasing Plan ≠ Reality

The leasing plan:

  • Updates every month

  • Reflects commercial status, not physical condition

  • Does not always reflect ground truth

  • On the technical issue, I cannot convert the PDF to vector due to a lot of clipping mask within the exported file.

During site reccy, I found:

  • Missing amenities

  • Incorrect tenant names

  • Different zone indicators

  • Inconsistent parking pillar references

  • Lift quantities mismatched

  • Directional inconsistencies

Relying solely on the plan would produce an inaccurate navigation tool.

2. Scale & Complexity

Mall sizes:

  • ICM (Putrajaya) – ~2.5 million sq ft, 9 floors

  • IMP (Puchong) – ~1 million sq ft, 6 floors

  • IMD (Damansara) – ~1 million sq ft, 11 floors

Each mall has:

  • Different zoning logic

  • Different amenities distribution

  • Different circulation layouts

ICM uses quadrant-based zones (A–H).

IMP and IMD do not follow the same zoning system, thus making a single template could not be blindly applied, but they shared the same resources such as assets of icons and components.

3. Navigation-First Constraint

Unlike a printed directory, this was a digital navigation system through functional spatial communication, which require the map need to:

  • Be legible at multiple zoom levels

  • Support layered overlays

  • Remain clean under dynamic UI elements

  • Avoid visual noise

Printed site-recce checklist on a clipboard used to validate floor plans against the actual mall

Strategy

1. Ground Truth First

When I first started for the first mall, I rely 100% on the leasing map. However, due to the false discovery, I refused to depend solely on leasing plans. I conducted full site reconnaissance for each mall:

  • Walked each floor physically

  • Cross-checked tenant names

  • Verified amenities locations

  • Validated lift cores

  • Confirmed directional markers (the way finding signages)

I converted all data into a physical checklist and created my own printed validation template to compare; the Leasing Plan, Actual Ground Condition and Digital Illustration to ensure alignment before digitization.

2. Phased Mall Deployment

The rollout was sequential within the same year and their dedicated time invested throughout the process along the way:

MallTotal Days InvestedSite Reccy & ChecklistMap Illustration (Draft to Approval)ValidationFinal Artwork Preparation
ICM (Putrajaya)403 weeks2 weeks2 days3 days
IMP (Puchong)123 days1 week1 day1 day
IMD (Damansara)161 week1 week1 day1 day

Time difference reflected size and spatial complexity.

Each reconnaissance involved thousands of steps and coordination with a Visual Merchandising officer familiar with spatial details.

3. Structured Map Construction Process

For each mall:

Step 1 — Trace Base Structure

Converted leasing plans into clean line versions.

Step 2 — Apply Base Color System

Defined zoning or neutral color logic depending on mall.

Step 3 — Apply Final Visual System

Introduced final color hierarchy for:

  • Tenants

  • Circulation

  • Anchor lots

  • Amenities

Step 4 — Standardize Iconography

Redesigned and unified amenities icons:

  • Toilets

  • Lifts

  • Escalators

  • Parking

  • Services

  • Special facilities

Step 5 — Point-by-Point Plotting

Every amenity manually plotted and validated.

Step 6 — Final Site Validation

Conducted a second physical walkthrough to ensure:

Digital map = Ground condition

Only then delivered to mall representatives.

Execution

Map System Logic

Designed the maps to:

  • Remain readable when layered with search results

  • Allow visual hierarchy for anchor tenants

  • Avoid over-texturing

  • Maintain consistency across three malls

  • Accommodate future updates

Zoning Adaptation

ICM:

  • Quadrant-based A–H zone logic

  • Large-scale segmentation required

IMP & IMD:

  • No explicit zone labeling

  • Required circulation-based visual clarity

Each mall required tailored spatial logic rather than forced uniformity.

Cross-Department Alignment

After completion:

  • Shared with each mall’s representative

  • Coordinated feedback loops

  • Integrated revisions before final deployment

Ongoing Monitoring

Post-launch responsibilities included:

  • Updating tenant changes

  • Adding new lot shapes

  • Adjusting amenities

  • Maintaining spatial accuracy

The map is a living system, not a static deliverable.

Outcome

  • Designed accurate illustrated maps for 3 major malls

  • Validated through physical site reconnaissance

  • Standardized icon system across properties

  • Created scalable mapping framework

  • Enabled high-volume digital navigation usage

Impact

  1. Reusable illustrated map for location internal reference.

  2. User interaction established in the digital way finding for 2025:

The illustrated maps became the navigational backbone for millions of user sessions. Internally, colleagues noted:

“Did you come out with your own template? That’s amazing.”

The template-based validation process improved spatial accuracy and reduced post-launch correction risk.

With thanks to Haris, Hanif, Farouq, Eric, Joyce, Lydia, Henry.

Next case studyParking module, CLUB IOI →